监视Australia's Biggest Transport Project

案例分析

View of Train at Sydney's Central Station being monitored by a Leica TM50 Total Station

作者:空间来源

‘Tested, tried and proven’ Leica instruments and software highlight the complex system monitoring the tracks and platforms during Central Station’s Sydney Metro upgrade.

Leica Nova TM50的视图监视悉尼中央车站的平台图1.团队利用28Leica Nova TM50监视站。

随着澳大利亚有史以来最大的运输项目悉尼地铁(Sydney Metro)的开挖和建筑桶,一支小而重要的工程师团队一直在悄悄地驾驶人群和隆隆的火车,这些火车定义了悉尼的中央车站。

They are using state of the art equipment to monitor the tracks and existing infrastructure to make sure the massive works necessary to bring new Metro trains to the 120-year-old Sydney landmark, aren’t endangering the more than 100,000 daily riders that already shuffle through.

这项重要的工作被授予GLS Monitoring, a joint venture between土地调查澳大利亚的地球. With an iconic building and the safety of so many riders on the line, the team knew the equipment had to be precise and sturdy enough to withstand the challenges of the busy station.

“值得庆幸的是,我对我们拥有的Leica仪器真的很满意,” GLS监控的仪器和监测经理Szabolcs Fajcsi说。

“We don’t get the call often, but for example the contractor might ring up on a Sunday night saying, ‘OK, can you just please check the south end of track 16 to see if there are any movements on the track that will cause us to stop the trains?’”

他说:“您必须非常快,准备好在发生不好的事情之前打电话。”“但是我们使用的仪器非常容易给出一个可靠的答案,以便当客户需要您打电话时,您可以打电话。”

强大而复杂的监视系统GLS监控团队在分销商的合作伙伴的帮助下开发了这些快速呼叫肯尼迪爵士.


Leica Geosystem's reflector installed across the tracks at Sydney's Central Station图2.团队在轨道和车站平台上安装了4,500多个棱镜反射器。

他们建立了一个庞大的网络,其中包括28个Leica Nova TM50监控站,指向跨越轨道和车站平台上安装的4,500多个Prism反射器以及各种其他岩土技术传感器。

团队雇用了Leica的Geomos监视软件,以密切关注全天候数据的数据,并提供警报,以防其检测到可接受的限制外的任何移动。

“GeoMoS is one of the more widely used pieces of software across the world, and we are familiar with its data structure and how to extract the information we need,” says Drew Coulthard, National Monitoring Manager with Land Surveys. “When it comes down to it, GeoMoS is tested, tried and proven.”


Leica Geomos监视软件设置以监视悉尼中央车站的任何机芯

图3. Geomos监视软件会保持警惕,并在检测到移动的情况下警报。

Coulthard says the team needed proven precision from each instrument they chose for the project.

他说:“ Leica Nova TM50S的关键因素之一是它们的ATR(自动化目标识别)能力,尤其是考虑到这项工作所需的所有密集的棱镜。”

他说:“因此,例如,在赛道上,您可能会有三米的棱镜,但是从乐器的视野中,它们看起来非常接近 - 在能够识别每个棱镜的情况下,Leica TM50非常出色。”

“And another major factor with the TM50s is that we know that they are really good hard-wearing instruments that perform well in a pretty tough environment.

”GLS Monitoring’s Szabolcs Fajcsi knows all too well how demanding Central Station can be on both the equipment and the team.

Fajcsi说:“嗯,我们有不断的维护,主要是因为每两周左右的棱镜都在轨道上和尘埃落定,每两周左右都会变得肮脏。”他说:“因此,有时候找到一个时间范围,您可以在轨道上跳下来并以车站的繁忙方式清洁并恢复目标,这尤其具有挑战性。”

Fajcsi says the GLS Monitoring team have had very few issues with the Leica TM50 monitoring stations even with the adverse conditions. But, in the very few instances where they units have needed some attention it was a real plus having the CR Kennedy support available at short notice.

他说:“通常将单位带到Cr Kennedy,他们可以为我们提供快速的校准或解决方案,通常只需几天的时间就可以给我们一个快速的校准或解决方案。”

Drew Coulthard with Land Surveys says the age and complexity of Central Station make it an especially exciting, but complicated, site to build at and to monitor. In other words, there is a lot of existing, vital, infrastructure and just about everything has moved over the years – even the tracks.


铁轨手推车提供自动轨道几何监控Fig 4. The Amberg GRP 1000 Rail Trolley provides automated track geometry monitoring.

这就是为什么团队让肯尼迪CR向他们提供Amberg GRP 1000铁路手推车的原因,他们用来对项目开始时对真实的轨道条件和几何形状进行基础调查。

Because of the dynamic nature of Central Station, Instrumentation and Monitoring manager Szabolcs Fajcsi says the trolley still tends to get used a few times a month, more than a year into the project.

“We have the monitoring from track eight all the way to track 23 – that is pretty much four kilometres of track in total,” Fajcsi says. “If there is some sort of maintenance on the tracks then we need to do a trolley survey to be able to provide automated track geometry monitoring.”

土地调查已经购买了至少两辆手推车,看到了他们可以在澳大利亚带来的项目的价值,其中包括一项主要的矿业巨头必和必拓和珀斯通勤铁路工作的铁路项目。

但是Fajcsi感到满意的是,将他的重点放在中央车站正在进行的大规模建筑项目上,并在确保其顺利进行方面的角色。

“This is pretty amazing,” he says. “The amount of excavation that they are doing right under the live tracks without any interruption on the traffic really is just amazing.”

“这是一个非常具有挑战性的environment to do monitoring in, and that just keeps us going.”

Information provided by CR Kennedy.

Kapcsolat Leica Geosystems

válasszaki a keresett leica geosystemsszolgáltatást,amihezelérhetőségetSzeretne:értékesítés,terméktámogatásvagy vagy szerviz。
válasszaki a keresett leica geosystemsszolgáltatást,amihezelérhetőségetSzeretne:értékesítés,terméktámogatásvagy vagy szerviz。