Case Study

bob体育报道Hexagon采矿客户Pena Colorada是墨西哥最大的铁矿石业务之一。Pena Colorada的业务位于科利马州,由Minatitlán的一个开放坑矿和港口城市Manzanillo的颗粒厂组成。

尽管每年的浓缩量为每年410万吨,但PeñaColorada仍面临矿石成绩下降。作为回应,该公司不得不进一步扩大生产。这种扩展带来了挑战,这些挑战通过采用和应用新技术以及在地址,矿山规划和矿山运营中的改进而克服了挑战。

这些技术的成功实施已多次支付,并导致了生产和性能的显着改善,同时降低了运营成本并减少了计划和执行之间的差异。


善于努力

记者80

第一步是提高资源模型的信心和可靠性。PeñaColorada沉积物包括受中度断层系统影响的三个主要地质结构。这三个结构以最新的材料特征来控制地质。

The mineral resource model was constructed in two stages:

  1. 地质模型的建设
  2. Numerical modelling of attributes

地质模型的建设involves three steps:

  1. Processing of the drilling campaign
  2. Accounting for the minimum scale of geological interpretation
  3. 构造周围固体。

The drilling campaign was processed through Hexagon Mining's mine planning suite, MineSight; specifically, its drillhole manager, MineSight Torque, and its 3D visualiser, MineSight 3D.

The geological envelopes were constructed as geometric solids using MineSight Implicit Modeler (MSIM) to accurately characterise the geological contacts. MSIM has since been replaced by Geologic, which leverages the power of implicit modelling by sequencing surfaces and solids to create an airtight geological model. The numerical modelling of attributes comprises the estimation of grades by localised ordinary kriging.

Once the block model was completed, new optimisation studies were evaluated with MineSight Economic Planner (MSEP) and new production schedules were completed with MineSight Schedule Optimizer (MSSO), which improved many aspects of the mine plan. For example, MSSO was used to evaluate and optimise the dump discharge plan.


从计划到现实

记者80

The results of the optimisation generated a plan with less stripping required in the earlier periods and a combination of short and long dumps, which balanced the truck hours over the life of the schedule and reduced the number of trucks required. The estimated gains from this optimisation study amounted to approximately $35 million in project value.

同样,MSSO也用于评估扩展项目和更大的铁锹(P&H 4100 XPC)和更大的卡车(CAT 789C和793F)。

"Mine expansion projects cost millions, if not billions of dollars," said Jose Villa, head of mine planning, Peña Colorada. "Investing in MSSO is easy to justify since it can guide important capital investment decisions and it costs less than the tires of an off-highway haul truck."

Additionally, new geotechnical studies were prepared, which provided new guidelines for pit slope design. New technology was implemented to monitor ground movement and slope stability.

Pena Colorada implemented Hexagon Mining's fleet management system (FMS) to monitor the operation and ensure plan execution and compliance. This enabled the company to capture in the field the value of the project as forecasted in the mine plan.

"However, there is always a variance between plan and reality," said Villa. "This has been significantly reduced with the adoption of best-in-class mine planning software and fleet management system."

Before the FMS implementation the designed blasthole collars for the production drills had to be staked out by surveyors. During the rainy season, however, the weather would delay the surveyors and consequently delay the drills, which hurt production. After the implementation of the FMS, the planned/design blastholes are transferred digitally to the drill equipped with high-precision guidance for accurate blasthole location, so there is no need for the surveyors to stake out the collars in the field anymore. Now production stays on track.

Vbob体育报道illa说:“ Hexagon Mining的矿山规划软件和车队管理系统缩小了应该与什么之间的差距。”“它有助于解锁并实现重大的项目价值。”

Reporter subscription

收到有关记者杂志的最新更新。
收到有关记者杂志的最新更新。

Kontakt Leica Geosystems

Finn din kontaktperson hos Leica Geosystems for salg, brukerstøtte og teknisk service.
Finn din kontaktperson hos Leica Geosystems for salg, brukerstøtte og teknisk service.

记者80

Download a PDF version of Reporter 80
Download a PDF version of Reporter 80

Around the world

Share with us how you are solving complex daily challenges using Leica Geosystems equipment.
Share with us how you are solving complex daily challenges using Leica Geosystems equipment.