Power Grid is India’s largest electric power transmission utility, and it has consistently been rated “Excellent” under the Memorandum of Understanding with the Ministry of Power since 1993.

The organisation is responsible for every phase of the power supply process:

  • Land specs
  • Tower installations
  • Energy distribution
  • Power lines maintenance

电网的使命是“确保开发有效,协调和经济的州际传输线系统,以使从发电站流向装载中心的平稳流动。”

Power Grid uses total stations and theodolites to capture the measurements they need in the field. The company has used Leica Geosystems for the past decade to collect data that helps ensure the safety parameters of electric supply towers are met and preventative maintenance is scheduled. These steps are invaluable in an industry where lives and livelihoods are at stake.

Story: Taking the heat
Chapter 1: Introduction
Chapter 2:Moving to a smaller, rugged solution
Chapter 3:Bringing the heat

Contact Leica Geosystems

找到您的Leica Geosystems联系,以获得销售,支持和技术服务。
找到您的Leica Geosystems联系,以获得销售,支持和技术服务。