取热

Chapter 1: Introduction

Author: Kevin Rinaldi-Young, December 2016

电网是印度最大的电力传输工具,自1993年以来,它一直在与权力部的理解备忘录下被评为“出色”。

该组织负责电源流程的每个阶段:

  • Land specs
  • Tower installations
  • Energy distribution
  • Power lines maintenance

The mission of Power Grid is “to ensure development of an efficient, coordinated and economical system of interstate transmission lines for smooth flow of electricity from generating stations to load centres.”

Power Grid使用总站和理bob apple想石来捕获他们在现场所需的测量。在过去的十年中,该公司一直使用Leica Geosystems来收集数据,以确保满足电源塔的安全参数并安排预防性维护。这些步骤在生活和生计受到威胁的行业中是无价的。

Story: Taking the heat
Chapter 1: Introduction
Chapter 2:Moving to a smaller, rugged solution
Chapter 3:带来热量

Kontakt Leica Geosystems

芬恩din kontaktperson居屋徕卡呈salg og teknisk support.
芬恩din kontaktperson居屋徕卡呈salg og teknisk support.