Theconstruction industry is embracing digital robotic total stationsfor the layout of building elements and internal fit out due to proven财务和时间福利– replacing the laborious tape measure and stringline approach.

Traditionally, the layout of building services on site involved working based on the provided paper drawings. These drawings were used in combination with tape measures, levels and grids to identify location points for elements, such as penetrations, pipework and cable trays. This is all changing now.


Digitising building construction layout

Digitising building construction layout

Based in Melbourne, Australia,V Constructionsspecialises in both high residential and commercial construction. Many of their recent projects feature complex designs with curved walls and buildings with prefabricated materials and non-orthogonal spaces. Seeking to improve efficiency, ensure accuracy and provide quality control, V Constructions purchased theLeica iCON robotic total stationafter being appointed as main contractors for the Holme apartments development; a14层混合用途开发包括连续弯曲的平板,釉面窗帘墙和阳台的组成。

V Constructions, a long-term customer ofC.R.肯尼迪,Leica Geosystems在澳大利亚的分销商了解,需要采用数字工作流程以与复杂形状合作,并比传统方法更快地进行项目。在发现该项目赢得该项目之后,该公司几乎没有时间切换到数字工作流程。

“我们需要一种易于采用,用户友好且需要最小的入职时间的解决方案,”said Douglas Thirkell, senior surveyor at V Constructions.Switching to a digital workflow and adopting the instrument was easythanks to C.R. Kennedy who provided technical support on site as the team implemented the iCON robotic total station from day one of the project.“该产品很容易拾取并立即被团队使用,”said Thirkell.

Designed by award-winning John Wardle Architects (JWA), the sculptured design includes 154 apartments, commercial and retail spaces above ground, and a160辆公园在三个地下室级别。建筑立面是该开发项目的杰出特征,原始的1920年代装饰艺术立面被保留在较低的正面和新的悬挂式砖砌立面上。

With the help of the iCON robotic total station, V Constructions is提供建筑结构,钢筋,混凝土布局和成品水平的准确定位。The complex nature of the building design would have made it near impossible for the V Constructions team to layout using traditional methods.


Making the switch to a digital workflow

Making the switch to a digital workflow

V Constructions traditionally used Leica Geosystems total stations (Leica TCR407 and Leica Builder) for previous building construction projects. The complexity of the Holme apartments project made it necessary for the team toinvest in a layout instrument in order to be more efficient on the site

Due to the complex nature of the building, each apartment is unique – there are
42个不同尺寸的湿区域and not many repetitions of the apartments on each floor. This sophisticated structure involved a greater amount of work for V Constructions surveyors Thirkell and Brian McLoughlin as they had to layout each individual piece. TheiCON robotic total station allowed the team to layout metal sections and fabricated concrete curves with simplicity and efficiency

“在评估技术投资时,对我们的关键是什么是该工具必须是机器人和一个人的操作,”said Thirkell.


通过有效而准确地应对复杂的布局挑战

通过有效而准确地应对复杂的布局挑战

The team at V Constructions set up multiple survey control points on site for instrument orientation purposes at any location around the curved structure. This technique meant they did not need to use grids for orientation when completing layout tasks.

Byadopting a digital workflow, V Constructions was able to ensurethe setup of the instrument was completed quickly and accuratelyandall plan data was immediately available on the controller。This ensuredquick and accurate layout processes被遵循,不必担心使用涉及弦线,磁带测量和SPIRT水平的传统方法所带来的一些变量和不准确性。

Every small mistake can lead to potentially serious consequences. Being a few degrees out on an angle can cause pre-fabricated systems not to fit when the time comes to install them. Similarly, incorrect layout can result in clashes with other building elements or services, thereby disrupting the construction schedule, generating unnecessary works and wasting materials, time and money.

在Holme站点上,建筑物的窗户包含曲线,而Glaziers则依赖于放置霍布斯以放置窗户的精度 - 炉灶已预制并固定在表单工作中。V构造团队没有错误的空间only a digital method could provide the team the confidence in accuracy needed- 网站上没有磁带尺寸或弦线。


“ [布局]的传统方法是费力且耗时的,任何延误都会影响其他团队的工作。Adopting digitisation and the Leica iCON robotic total station is really the way of future for us,”
said Thirkell.


Speeding up as-built plans


该项目具有巨大效率增长的关键阶段之一是计划。

Thirkell and McLoughlin were required to complete an as-built survey for every slab. Traditionally, they would set up a laser level and take a reading, manually creating a plan of the completed slab in the office. With the iCON robotic total station,该团队可以记录数据,并在一个小时内将其上传到CAD中,并将其清理并用于准备拟建计划

Quantifying the productivity improvements,采用图标机器人总站已节省了v构造每天一个人。这些是很大的节省的时间可能最终减少所需的操作员数on the project and reduce labour costs.


扩大生产力的提高

扩大生产力的提高

V Constructions realised the productivity gained by implementing a digital workflow during the Holme project and invested in its second iCON robotic total station for a new project – a chancellery building at Monash University. Located at the Clayton campus, the10,000平方米的建筑将包括一个地下室p水平的车arking, ground level public spaces, two levels of office space and a third level to house the University executive. The building includes a feature steel sunshade screen that wraps all elevations of the thermally-enhanced façade.

Abonnement au Reporter digital

Recevez le magazine Reporter en PDF par email.
Recevez le magazine Reporter en PDF par email.

CONTACTER LEICA地理系统

Trouver Fotre与Leica Geosystems联系,conseil de vente,Une援助技术OU une Deculte sav。
Trouver Fotre与Leica Geosystems联系,conseil de vente,Une援助技术OU une Deculte sav。

记者86

Download Reporter PDF
Download Reporter PDF

Around the world customer images

Around the world. Any day. Any application.
Around the world. Any day. Any application.