bob综合app赌博BIM的现实捕获

作者:Renata BarradasGutiérrez

具有集成功能特征的3D数字模型改变了个人,企业和政府计划,设计,建造和管理建筑物和基础设施的方式。建筑信息建模(BIM)改变了建筑,工程和建筑行业的专业人员的方式,这要归功于3D智能模型,这些模型准确,易于访问,可访问和可行。

Sertogal SL used Leica Geosystems’ laser scanning solutions to create a BIM model that will guide the remodeling and expansion of the electrical substation of Mera in the Spanish province of Ourense. This project is part of an ambitious initiative that will partly absorb the17个新风电场产生的能源生产planned in the region.


Laser scanning – the foundation for a full BIM model

To plan the remodeling and expansion of the substation, the first step was to measure its distances, angles and areas, with millimetric accuracy. Sertogal SL captured the substation with the Leica ScanStation C10 and georeferenced the point cloud obtained with the Leica Viva GNSS technology.

“由于它的出色reliability and precision。这C10 ScanStationwas no exception - it can beeasily adapted扫描建筑物,变电站或电气高压塔,”Sertogal SL的技术工业工程师SergioRodríguez说。“The laser scanner allowed us to capture the substation without entering in dangerous high voltage areas with risks.”

“精确和缺乏噪音in the generated point clouds permitted us to work in a complex structure with metallic elements and grids to obtain a BIM model that is a true representation of reality,”罗德里格斯说。

这post processing, modeling and managing of the point cloud was done withLeica Cyclone,市场领导者点云处理软件。从变电站中的丰富的积分云数据导入到Autodesk Revit以创建BIM模型,并且使用Autodesk NavisWorks将元素插入和分类为BIM模型。


Intelligent asset documentation for everyone

从变电站的点云中获得的3D智能AS构建的模型Sertogal SL:

  • 收集现有的条件ns
  • Measured the distances
  • Analysed the site

This created the preliminary plans for the substation and the surrounding environment.

“The great volume of data obtained made possiblea very accurate modelling of the elements and structuresthat are part of the substation,”Sertogal SL的BIM专家BrunoSánchezUcha说。

这delivered BIM model of the substation allows stakeholders to take a digital tour that offers a complete outlook of the captured reality plus the visualisation of its different parts and elements with linked information.

Wires, tubes, isolators, circuit breakers and so forth, were embedded as intelligent elements and grouped in systems. This enables all parties involved in the remodeling to review how the projected substation developments will look like and how changes will transform the current space.

This intelligent model-based design process will help to start the renovations and manage operations in the future, and willdrive workflows with accuracy and in a more productive way


BIM - 必备

全球越来越多的公司了解BIM在整个建筑和基础设施项目的生命周期中的价值和收益。

女子项目需求的增长也同样相信年代ertogal SL of the opportunity to position itself as a pioneer in Spain, offering BIM services for several maintenance and renovation projects.

世界各地的政府,例如西班牙公共工程部,都建议,鼓励或强制BIM,认可其所提供的价值和利益:

  • Reduce project duration and cycle time特定的工作流程。
  • 加强协作与协调in every stage of a project.
  • Reduce errors并具有准确的文档。
  • 创建新业务by offering new services.
  • Increase profit, and reduce construction costs and waste.

Professionals have to be equipped with a laser scanner that delivers outstanding precision, rate, speed and data quality to create a BIM model. Leica Geosystems laser scanning technology helps create such a model that provides the right insights so managers can understand risks and make informed decisions to deliver projects responsibly despite time constrains.

记者订阅

Receive the latest updates about Reporter magazine
Receive the latest updates about Reporter magazine

联系Leica Geosystems

找到您的Leica Geosystems联系,以获得销售,支持和技术服务。
找到您的Leica Geosystems联系,以获得销售,支持和技术服务。