拉娜(Lana)效率

More than 1,500 lights have to be recorded and categorised in the South Tyrolean market town of Lana. The background of this action is a resolution by the South Tyrolean government which intends to optimise public street lighting with regard to energy efficiency and minimised light pollution. Light planner Christian Ragg developed a master plan for public lighting which focuses on saving energy and curbing light pollution in the night sky. This plan was implemented with the Leica Zeno 5 and support from mobileGIS.at.

Christian Ragg, a light technology engineer from the neighbouring country of Austria was commissioned with illuminating Lana in the area of light. “Step one is to take inventory of public lighting, and step two is to develop a light plan with which the town can comply with the stipulations of the local government's ordinance.”

拉娜镇的一项要求是,承包商必须以将其集成到区域地理信息系统中,并将其提供给管理层。这就是为什么Ragg选择依靠Leica Geosystems的支持来完成其委托任务的原因。他联系了“ Mobilegis.at.at”的DI(FH)Martin Trimmel:“作为一名轻型技术人员,记录点的地理位置并不是我日常工作的一部分。Martin Trimmel为我提供了来自Leica Geosystems的手持ZENO 5 GPS,这是我可以用来有效地进行工作的设备,并且在每个人都可以接受的时间范围内。”

After a brief training period, Ragg got started. He hopped on a bicycle and rode to all the lights in the city, point by point. “I was happy to be equipped with such a lightweight and handy device,” said Ragg. While the device determined the position of the light point, Ragg filled in the predefined entry fields, such as light type, bulb type, age of the light and light point height, on the device and was able to cover about 170 to 180 lights per day.

因为我记录一个小镇的户外照明sn't part of Ragg's everyday work, he decided to have the GIS evaluations carried out by mobileGIS. at. He sent the data gathered with the Leica Zeno 5 to Martin Trimmel, who prepared it for the light technician using the Zeno Field & Office software and sent it back to him for further evaluation in the form of Excel tables and a PDF location plan with streets and integrated light points. The city of Lana, on the other hand, received direct GIS-capable shape files from Trimmel. Using these files, further development of the lighting network could be documented and controlled.

以调查为基础,拉格任务的第二部分可以开始 - 制定轻计划。他将制定一项建议,其中效率低下的灯光和灯光会造成大量光污染的灯光,将被有效的光系统取代,其可能的光污染最小。拉格说:“该提案将与该镇讨论并以步骤实施。”这将使拉娜能够以节能,经济和环保的方式照亮。该镇同意了,Ragg正在使用Leica Geosystems技术作为基础实施它。

Written by Toni Everwand

记者

Check out more customer case studies in our quarterly magazine记者
Check out more customer case studies in our quarterly magazine记者

otayhteyttäLeica Geosystemsiin

Etsi Leica Geosystemsin yhteyshenkilö myyntiä, asiakaspalvelua ja teknistä tukea varten.
Etsi Leica Geosystemsin yhteyshenkilö myyntiä, asiakaspalvelua ja teknistä tukea varten.