以速度建立可靠的职位

Chapter 1: Reducing potential errors

作者:凯瑟琳·雷穆勒(Katherine Lehmuller),2016年5月

在美国科罗拉多州的一个多户住房项目上工作,涵盖了六个三层楼的公寓大楼,25个联排别墅和一个带游泳池的会所,成功地启动了黄金建筑与当地客户之间的业务关系。Leica Geosystems的图标产品使该bob综合app下载项目的建筑人员能够有效地工作,从而带来了大量的时间和金钱。

Golden Construction,LLC为主要行业的客户提供一般建筑服务,包括医疗,商业,工业,多户家庭和教育领域。近二十年来,金建筑总部位于阿拉巴马州伯明翰,一直是Leica Geosystems的客户。

The housing project going up in Fort Collins, Colorado, is one of the largest multi-family projects under construction in the area and consists mainly of more than 300 one-, twoand three-bedroom units, to be completed by the end of summer 2016. One of Golden Construction’s main tasks on this project, before concrete was poured, was to verify that plumbing and electrical items were in their correct positions. Another task was to establish control lines on floor slabs for the framing contractor to layout and build the wooden framework.

Reducing potential errors

Making sure all of the plumbing is in the correct location has certainly been one of the largest tasks of this year-long project. All totalled, there are roughly 1,900 pipes to be installed throughout the buildings. The complex’s plumbing and electrical contractors were using string lines and measuring tapes to carry out their layouts. With a project of this size, this method of layout is likely to contain errors leading to substantial problems in the building process, leading to higher costs.

In order to be certain everything is built as designed, Golden Construction opted to use Leica iCON robots. Golden Construction has confidence using Leica Geosystems iCON products because the results are very reliable. Since this was the company’s first business venture into the state of Colorado, the project played an important role and successful verifications of plumbing, electrical lines and framework control lines were important to the completion of this project.

The vast amount of items to be checked and laid out represented a major challenge. Not only accuracy was important – speed was, too. Should the concrete contractors be delayed in pouring the concrete, it would be costly. Golden Construction decided on the Leica iCON robot 60 running the latest iCON field software. Also, the Leica iCON CC80 controller was used to facilitate point collection and transfer the data back to the office.

Explore next chapter:节省成本的快速验证

Story: Establishing reliable positions with speed
Chapter 1: Reducing potential errors
Chapter 2:节省成本的快速验证

Reporter 74 - May 2016

Download your own "Reporter 74" as a PDF file.
Download your own "Reporter 74" as a PDF file.

CONTACTER LEICA地理系统

Trouver Fotre与Leica Geosystems联系,Une援助技术OU UNE Deculte Sav。
Trouver Fotre与Leica Geosystems联系,Une援助技术OU UNE Deculte Sav。