速度建立职位

在美国科罗拉多州的一个多户住房项目中工作,涵盖了六个三层楼的公寓大楼,二十五个联排别墅和一个带游泳池的俱乐部房屋,成功地启动了黄金建筑与当地客户之间的业务关系。Leica Geosystems的图标产品使该bob综合app下载项目的施工人员能够有效地工作,从而为时间和金钱带来了巨大的积蓄。

黄金建设有限责任公司公关ovides general construction services to clients in major industries in-cluding medical, commercial, industrial, multi-family and educational fields. Based in Birmingham, Alabama, Golden Construction has been a customer of Leica Geosystems for almost two decades.

The multifamily housing project going up in Fort Collins, Colorado, is one of the largest multifamily projects under construction in the area and consists mainly of over 300 one, two and three bedroom units, to be completed by the end of summer, 2016. One of Golden Construction’s main tasks on this project, before concrete was poured, was to verify that plumbing and electrical items were in their correct positions. Another task was to establish control lines on floor slabs for the framing contractor to layout and build the wooden framework.

减少潜在错误
确保所有管道都位于正确的位置无疑是这一年的项目中最大的任务之一。全部总计,整个建筑物中大约要安装1,900个管道。该综合大楼的管道和电气承包商正在使用弦线和测量磁带来执行其布局。有了这个规模的项目,这种布局方法可能包含错误导致建筑过程中的重大问题,从而导致更高的成本。

为了确定所有内容都是按设计构建的,黄金结构选择使用Leica Icon机器人。黄金结构使用Leica Geosystems图标产品具有信心,因为结果非常可靠。bob综合app下载由于这是该公司第一次进入Colo-Rado的业务,因此该项目发挥了重要的作用,并成功地验证了管道,电线和框架控制线对该项目的完成至关重要。

The vast amount of items to be checked and laid out represented a major challenge. Not only accu-racy was important – speed was too. Should the concrete contractors be delayed in pouring the concrete, it would be costly. Golden Construction decided on the Leica iCON robot 60 running the latest iCON field software. Also, the Leica iCON CC80 controller was used to facilitate point collec-tion and transfer the data back to the office.

节省成本的快速验证
Steven Denney, Project Support at Golden Construction, specialises in building layout and supports most project crews on-site with CAD drawings, point files and by establishing control points. Steven points out, “The ability to quickly find the problems and get that information back to the related trades helped them save time and money. If concrete pours were delayed because of time spent verifying the work, it would be costly to all parties involved and any rework after concrete has been poured could be detrimental.”

同样,史蒂文(Steven)还评论了图标构建现场软件,然后说:“我们发现参考线命令确实是有用的检查点。该现场软件允许相对于建筑线的实时距离读取(平行和垂直),而不仅仅是引用仪器的位置。以这种方式传输的信息对野外人员了解更为有用和实用。”

Using Leica iCON robot total stations enabled just one person to control all the work, fast and effectively and Golden Construction’s Co-op Chris Dixon, a student at Auburn University in Alabama, was able to check the work extremely fast. Chris could then also quickly pass the information on to the subcontractors, in the event that something needed to be corrected. Autodesk’s AutoCAD® software was used to take the information recorded in the field and overlay it with the building plan to verify that everything was in its correct position and further used in the office to help with layout across all of Golden Construction’s projects.

Project superintendent Lynn Spradlin adds “We could train a less experienced up-and-coming em-ployee to perform layout like a seasoned veteran and repurpose our experienced superintendent to lead subs instead of staying behind the equipment collecting points.”

建立新的,强大的业务合作伙伴关系
由于与他们在美国科罗拉多州的新合作伙伴一起,Golden Construction能够扩大其地理占地面积。他们致力于快速可靠的专业服务作为承包商,这是建立新的,牢固的业务关系发展的基础。

由卢卡斯·鲍姆加特纳(Lucas Baumgartner)撰写

Reporter

在我们的季度杂志中查看更多客户案例研究Reporter
在我们的季度杂志中查看更多客户案例研究Reporter

联系Leica Geosystems

Find your Leica Geosystems contact for sales, support and technical service.